Tuesday, May 22, 2012

Week 8 Post

In last weeks lab we learned how to do calculations of bridges by hands.  We first had a group discussion where we learned about Bridge Designer.  This program reminded me of Westpoint Bridge Design in the way that you make the bridge on only side and the program also calculates compression and tension.  We then went over free body diagrams and other calculations.  After we split off into smaller groups we had the chance to do calculations of a given bridge by hand.
            This analysis would not be sufficient for a real bridge.  For a real bridge other forces would have to be put into the equations also there would have to more known about the members and joints.  These calculations were also for only one side of the bridge.  We would need to analyze the top, bottom, and the other sides of the bridge.  Other things would need to be accounted for like weather and wear and tare.  It would also be nice to know how much the bridge could hold and an estimate on it life span.
-John Watson

Wednesday, May 16, 2012

Week 7 Blog Post

     Last week during lab each group got to test the 2 foot bridge each group made. After a miscommunication about who was supposed to bring the bridge to class we were able to make minor tweaks to try and get the bridge cost down while making the strength of the bridge increase. We also had to make the bridge slightly longer because we made the bridge exactly 2 feet long and it wouldn’t sit on the supports that were used for the test. Furthermore the cost of our bridge was through the roof and we need to change the outlook we have when building the 3 foot long bridge. The total cost was somewhere around $375,000 which was far more than any other bridge, but our bridge did hold 39.4 lbs. which we all believe was an amazing feat. For when we are building the 3 foot bridge I think that we should lower the cost by not using grooved gusset plates which, when tallying up the total amount, were the biggest contributors to the cost.
     For lab if I could see some of the forces that West Point Bridge Design shows you I would really want to see where the tension is specifically on the gusset plates. The reasoning behind this is that when every bridge in lab broke it was at a point where a gusset plate had a connection. I personally do not believe that compression would be necessary to see because the Knex pieces are pretty strong and the only weak part that I see is at the point of connection with the gusset plate. I would like to be able to test our 3 foot bridge more in lab before actually putting back into the competition so that we can get a better feel of what exactly is going wrong with our bridge so we can fix it and try again rather than just thinking in theory about how we could possibly make our bridge better. Or goal for next lab is to definitely get our cost to weight ratio down so we have a better chance of being the best bring next time.

-Robert LaChance

Tuesday, May 15, 2012

Week 7 Blog Post

Last week in lab, we were able to officially test our bridge and make any desired changes. After making a few last minute changes to the bridge to cut down on cost and make the bridge slightly longer, we tested the amount of weight our bridge was able to support. We tested this by placing the bridge between two sawhorses and hanging a bucket from the center of the bridge. Sand was then slowly and continuously added to the bucket to add weight. The maximum weight our bridge was able to support was 39.4 lbs. I'm very happy with this result but I would like to significantly cut down on cost to bring down our cost to weight ratio.
As I mentioned earlier, one of the biggest differences between West Point Bridge Designer and Knex testing is that the Knex bridge construction does not provide us with exact calculations of weight and tension like WPBD does. When testing with Knex, I would like to know the exact areas of our bridge where weight and tension are highest. Knowing this would help us make necessary adjustments to the bridge to further increase the amount of weight it can hold. Calculating these on the Knex bridge would be very difficult. However, I was able to determine where the bridge gave out when it reached it's weight limit and collapsed. I recorded our test trial and by viewing the video in slow motion, it is clear to see that the bridge gave out on the left side, right where the lower support truss section ends. In order to correct this, we could add more supports in that area but at this point we are focusing mainly on lowering cost and removing unnecessary pieces instead of increasing strength. We have some ideas on how to lower cost and I look forward to continuing the testing in lab this week.

Week 7


Last week in lab we got to test our bridge design.  The bridge we tested was 2 feet long.  The bridge had an under truss, which when tested the bridge broke where the under truss ended.  The reason we put the under truss in was so that it dispersed the weight.  When tested our bridge held about 39 pounds.  The problem was that the bridge was way too expensive.  I think our bridge ended up being the most expensive in the class, which was about $380,000. The amount of joints used is what gave the bridge most of its cost.  To combat this we decided that we have to make our members longer so that we used fewer pieces therefore making the bridge less expensive.  Since the weakest points on the bridge is the gusset plates we will have to come up with a solution to make them stronger some how.
            As far as numbers go I would like to see where the most compression and tension is on the bridge.  This is so we can see where to add more supports and even take pieces off if they do not add any support.  This would also be great to see if other designs work better.  The only way I can think to test of compression or tension is to feel for it.  You will have to try and bend members with your hands and see which ones resist the most.  Unfortunately you cannot see all calculations in real life like you can in Westpoint Bridge Design.

Wednesday, May 9, 2012

Week 6 Blog Post

In week 5 our group we started to form our 2' Knex bridge. When forming the bridge we took ideas from each persons bridge in hopes that it would create a great bridge. We had to make some comprimises because when we came up with ideas for the bridges they could only really work in West Point Bridge Design. When we first made the bridge we used my design and just used some tight cubes to span the required length. Later in the class we added another layer on top to add to the strength of the structure and unfortunately the cost of the bridge. The total cost came out to around $250,000 which can and will be improved on.

In relation to how I viewed the differences last week between West Point Bridge Design and using the Knexs stands. Knex have a limited amount of materials that can not be used to make the more complex angles and be used to opptomized for the bridge to be the least costing posible. While West Point Bridge design has a more unrealistic view to it, but will show you where more supoort or losst support is needed. For the week ahead I would like to keep working out the little things to make our bridge a little bit better at a time. Can not wait to test out our bridge!

-Robert LaChance

Tuesday, May 8, 2012

Week 6 Blog Post

Over the course of last week, week 5, we worked more with Knex. We put together some great ideas from everyone in the group to create one group bridge. We, as a group, decided to spend a little more money, using a lot of pieces, and attempt to build a bridge that can hold very large amounts of weight. We were able to test the bridge and were very happy with the results. Our bridge was able to hold more weight than could be fit in the testing bucket. In regards to the difference between Knex and WPBD, I stand by my previously stated differences. The biggest differences are still the physical presence of the Knex bridge and the overdramatized bridge movements in WPBD.
There are many differences between working with Knex and building a real steel bridge spanning about twenty feet. The first and most important difference is that in the construction of a Knex bridge, no lives are in danger. With the Knex bridge, a small scale model is created to simply test how much weight the bridge can hold versus the estimated cost of producing the bridge in real life. Another major difference between creating a Knex bridge and a real bridge is that the Knex bridge will not be exposed to weather and other natural effects that factor into a bridge's functionality such as wind, rain and extreme heat. These factors would also wear down a standard bridge over time by means of corrosion.
This week, we plan to do more testing on our bridge and edit it accordingly. We will possibly remove some less important pieces that could save us some money. Depending on the outcome of the tests, we may decide to alter the bridge's design slightly. I would like to do a little more testing of our bridge's ability to distribute weight and make necessary adjustments. My biggest fear is that the bridge will not be able to evenly distribute the weight of the bucket. Regardless, I am excited to continue working on our bridge in lab this week.

Monday, May 7, 2012

Week 6


In week 5 we finally got to start working with Knex.  When making our 2’ bridge we combined all of our ideas together.  We took designs similar to the ones we drew and the ones we created in Westpoint Bridge Design.  Our design was a little bit expensive.  Apparently it only costs $250,000, I think I may cost more but I did not do the estimate.  Our first design started out with a bunch of cubes put together to span 2’.  We tested this design out and there was not enough weight to break it.  After we brought the original bridge back to our station we added a top piece that covered the middle.  This design now looks similar to the one I made in Westpoint Bridge Design but with different trusses. 
            My views of the similarities and differences have not changed at all.  Obviously there are going to be a lot of differences between a Knex bridge and a 20’ real bridge.  The first thing that comes to mind when comparing the two is the materials that are used.  Cement and steel are a lot different then plastic.  The real bridge will be able to hold a larger weight because of the stronger materials that it has.  Another thing is that the Knex really limits what designs you can make.  There are only certain angles that you can make with Knex but on a real bride you can make what ever angle you would like.  In the real world a bridge cannot simply be tested like the Knex to see how much weight it can hold.  Engineers need to be 100% sure that their bridge can hold X weight otherwise lives are being put in danger. 
        -John Watson